
4
Soccer fields drainage
40,000m²
Turf laid
14
Lighting poles
| Client | Canterbury Bankstown Council |
|---|---|
| Location | Bass Hill | NSW |
| Sector | Sporting Facilities |
| Services | Landscape & Civil |
The Crest
The Crest project involved extensive site preparation, including herbicide application, soil cultivation, and cut-and-fill operations to adjust levels for four major sports fields, integrating the area with the surrounding landscape. Key features included installing a cricket wicket, goal posts, and chain wire fencing for security and structure around the fields.
A major aspect of the project was the installation of irrigation and drainage systems, alongside the construction of a 200 kL concrete water tank to support the site. We laid over 40,000m² of Couch turf and installed 14 lighting poles at 28 metres in height. Additionally, we renovated the existing clubhouse building, added a new playground with exercise equipment, and installed a wet-pour rubber surface for safety and durability.













